|
After a power failure that disrupted 911 telephone service, the city of Broomfield, Colorado decided they needed to upgrade their electrical system. NEI suggested ways of increasing the reliability of their power system. After assessing their existing equipment, we provided the design, contract documents, and specifications which were used to install a new dual-input uninterruptible power supply on the city's 911 calling system.
The project was successfully completed and went online March 7, 1999.
Back to Engineering Portfolio
|