Transmission Engineering & Design
Overhead, Underground, or Anywhere in Between. We Have You Covered. As power demands continue to grow across various industries, the…
Is Your Substation Ready?
Retrofit DFRs with NEI’s turnkey solution. Meet NERC standards. Minimize disruption.
NERC created PRC-028 to address a growing data gap across IBR sites.
After recent events (like the Blue Cut Fire and the Odessa disturbance), it became clear that grid operators needed better visibility into how inverter-based plants behave during faults.
PRC-028 now requires plant-level disturbance monitoring, event recording, and SCADA data to support performance tracking and model validation.
NERC PRC-028-1 Disturbance Monitoring and Reporting Requirements for Inverter Based Resources (PRC-028-1) requires high-speed data capture across your facility, and it’s not just plug and play.
NEI’s PRC-028 Compliance Solution™ bundles everything you need to meet the standard, without disrupting operations.
Our PRC-028 Configurator helps you scope your retrofit and understand your options in minutes.
Featured Tech Paper
Current standards define accepted methods of substation bus design. These standards also require certain strength and deflection criteria. This paper will examine commonly proscribed rigid bus design methodologies and compare them with actual field experience in the design of a 500kV switching station.
Overhead, Underground, or Anywhere in Between. We Have You Covered. As power demands continue to grow across various industries, the…
System Performance and Reliability Through Studies An optimized design that balances reliability and cost requires strategically selecting required power system…
Seamless Integration from Concept to Construction-ready Designs When it comes to planning and executing electric power projects, civil and structural…
The Modern Standard It’s no secret that much of America’s grid is aging and desperately outdated. Thanks to rapid advancements…